Green Stormwater Infrastructure at UT

photo-7

Tree filter and weather station located next to the Law School.

Bioswale Planting

UT Students planting the bioswale in September 2014.

Green stormwater infrastructure was constructed at the University of Toledo in 2014 from USEPA GLRI through Lucas County SWIF Funds.  These projects include a tree filter located adjacent to the Law School and a bioswale below Savage Arena.  Both structures are located between parking lots and the Ottawa River.  UT students have been intimately involved in design, construction, and ongoing monitoring of these sites. Below is a location and copies of educational signage posted at each of these locations.

Screenshot 2015-10-05 18.57.53

 Monitoring is an important aspect of green stormwater infrastructure since there is little data related to performance.  Data that exists is site specific. We have installed a weather station at the University of Toledo which collects real-time weather data including rainfall, windspeed, relative humidity, and temperature adjacent to the tree filter.  These measurements vary significantly with distance and are critical for accurate estimates of stormwater runoff. This data is publicly available online.

The link for the real-time data collected every minute: https://www.hobolink.com/p/aa90e60bbfbbb7ef63a9da89c178cc8e       

 

 

 

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s